Applications / Mining
Mining survey & volumetrics
Stockpile volumes, pit mapping, blast monitoring.
MTOW 3–10 kgEndurance 30–90 minPayload 0.5–1.5 kgRange 2–10 km
Typical technical architecture
A common reference configuration. No component here is universally appropriate — mission profile, regulation and integration constraints decide.
Airframe
Dust-tolerant frames.
Sealed motors for dust.
Temperature-tolerant packs.
Flight controller
Autopilot with redundant IMUs is common; confirm port count against peripherals.
Navigation
On-site RTK base.
Communications
Pit-shadow mitigation.
LiDAR or mapping camera.
Volume reports.
Ground control
Ruggedised GCS with mission planning.